Describe the benefits of GIS for managing the power distribution system.
See Answer →What do you understand by energy intensity and energy efficiency.
See Answer →Distinguish between section 135 and 126 in the context of IEA 2003 dealing with theft/pilferage of energy.
See Answer →What is meant by Billing efficiency and Collection Efficiency? Give the equation, allowing calculation of AT&C loss from the two efficiency factors. Q.10 (a) A consumer reverses the CT connections in a three phase four wi
See Answer →Identify the factors contributing to Technical loss and Commercial loss. Mention the techniques to reduce the Technical losses.
See Answer →Why was the T&D loss assessment changed to AT&C loss determination in distribution? Hence explain the term AT&C loss.
See Answer →Mention the two parts of R-APDRP? What is the significance of Ring-fencing in loss reduction?
See Answer →Discuss the variation in dielectric strength variation with altitude. How would the ground clearances or Rod gaps be altered as compared to sea level in a 33/11 KV substation at high altitude.
See Answer →With the help of a Single Line Diagram indicate the switchgear and equipment used in a typical 33/11 KV sub-station. Mention the annual maintenance practices adopted.
See Answer →Load Loss factor
See Answer →Load Factor
See Answer →Diversity factor
See Answer →Explain the importance of following:
See Answer →Mention the steps in developing a modern distribution system for a satellite town area. Indicate the planning and design steps involved
See Answer →Discuss the importance of benchmarking as a tool to push the BPR in a distribution utility.
See Answer →The key to success of distribution reforms is the Business Process Re-engineering. Compare the business processes in the vertically integrated Utility structure and the emerging unbundled structure in the distribution.
See Answer →Giving the internal block diagram of an electronic meter explain the role of watchdog timer.
See Answer →Show with the help of a diagram, how is energy registered correctly in case of electronic meter with neutral removed and load running through the earth.
See Answer →Discuss the relevant provisions of IEA 2003 and National Tariff Policy aimed at rationalizing the tariff in the electricity sector
See Answer →Discuss the emerging role of Energy Efficiency in the distribution sector in mitigating the demand –supply deficit.